5Ideal Logic Code Combi - Installation and ServicinggENERaLBoiler size g.C. appliance No. pI No.(Benchmark No.)26 47-348-74 86-CL-15133 47-348-75 86-CL-15138 47-348-76 86-CL-151CONTENTsair supply ...................................................................... 9Benchmark Commissioning Checklist ..................... 62Boiler Clearances ....................................................... 10Boiler Exploded Diagram ........................................... 13Condensate Drain ....................................... 9, 22, 23, 38Electrical Connections ............................................... 29Electrical supply ........................................................... 9Extension Ducts - Fitting ...................................... 20,21Fault Finding .......................................................... 53-59Flue Fitting .................................................................. 16Flue Installation ............................................................ 8gas safety Regulations ............................................... 7gas supply .................................................................... 8Installation .............................................................. 13-35pump ........................................................................... 49safe handling ................................................................ 6servicing ................................................................ 36-53short List of parts ...................................................... 60Thermostatic Radiator Valves ..................................... 9Water and systems ............................................9,11,12Water & gas Connections ......................................... 28Water Treatment ........................................................ 12Wiring Diagram ........................................................... 31Natural gas onlyDestination Country: GB, IEB oiler pageMake and model......................................................... 5Appliance serial no. on data badge .......... Front CoverSEDBUK No. %.......................................................... 4ControlsTime and temperature control to heating ................. 29Time and temperature control to hot water ............. 30Heating zone valves ................................................ n/aTRV’s.......................................................................... 9Auto bypass ............................................................... 9Boiler interlock............................................................ 9For .................................................................... all boilersFlushing to BS.7593 ................................................. 12Inhibitor .................................................................... 12Central heating modeHeat input...................................................to be calculatedFor assistance see Technical Helpline on the back pagepageBurner operating pressure ...................................... n/aCentral heating flow temp. ...........measure and recordCentral heating return temp. ........measure and recordFor combination boilers onlyScale reducer ........................................................... 12Hot water modeHeat input ............................................to be calculatedMax. operating burner pressure .............................. n/aMax. operating water pressure........ measure & recordCold water inlet temp ...................... measure & recordHot water outlet temp. ..................... measure & recordWater flow rate at max. setting ........ measure & recordFor condensing boilers onlyCondensate drain ..................................................... 22For all boilers: complete, sign & hand over to customerFor GB, to comply with Building Regulations Part L1 (Part 6 in Scotland) the boiler should be fitted in accordance with themanufacturer’s instructions. Self-certification that the boiler has been installed to comply with Building Regulations can bedemonstrated by completing and signing the Benchmark Commissioning Checklist.Before installing this boiler, read the Code of Practice sheet at the rear of this book.BENChMaRK COMMIssIONINg ChECKLIsT DETaILsNOTE TO ThE INsTaLLER: COMpLETEThE BENChMaRK COMMIssIONINgChECKLIsT aND LEaVE ThEsEINsTRUCTIONs WITh appLIaNCEIDEAL LOGIC CODE COMBI