Page 42/112 GEO S12 HARDWARE SETUP PROCEDURE8.3.5 GEO S12 vertical array cable mounted on a ceilingRequired items• 1 x GEOS12-FBUMPER;• 2 x GEO S12-LBRK (allows cable suspension for bumper, holes for cable suspension are 10mmdiameter);• (N-1) x GEOS12-ANPL for a N x GEO S12 array (ANPL1 ranges from 0.2° to 3.15°, ANPL2ranges from 5° to 10°, ANPL3 ranges from 16° to 30°)• 4 slings and shackles (not provided)IMPORTANTEnsure that the ceiling is strong enough to hold GEO S12 cluster weight and that thecables suspension system required fixing the bumper under the ceiling is properlydimensioned.Procedure• Connect the bumper and the two “L” brackets using the screws, washers and bolts provided inthe GEO S12-LBRK kit;• Proceed as in preceding section;• 4 slings and 4 shackle (not provided) are required to secure the cluster under the ceiling;