GEO S12 HARDWARE SETUP PROCEDURE Page 63/1128.4.9 Ground stacked GEO S1210Required items• N Pair of Rigging Plates (GEOS12-XBOW-V2) for N cabinets;• 1 ground stack device (GEOS12-GSTK);• 4xN Quick release pins for N cabinets;IMPORTANT- Ground stack device GEOS12-GSTK is rated for a maximum of 6 GEO S1210s in any intercabinet angle configuration, provided this device is assembled according to below rules.- Ground stack device GEOS12-GSTK must always be installed on a horizontal surface;- Bottom GEO S12 tilt angle must be limited to +/-10°- Ensure that public is not allowed within a safety area which radius is equal or higherthan assembly height.Optional GEOS12-TLB link bar for GEO S12 XBOWGEOS12-XBOW-V2s are delivered with standard link bars which allow both stacked and flown setups.However, these link bars require perfect alignment of angle setting holes when adding cabinets.GEO S12 X-BOW STANDARD LINK BARTo facilitate flying and stacked operation, an optional link bar with oblong holes (GEOS12-TLB, pair oflink bars provided with two 8x20 quick release pin) is available in the GEO S12 accessory range.GEO S12 X-BOW OPTIONAL GEOS12-TLB LINK BARTo install GEOS12-TLB, remove the standard link as well as nut, screw and washers.When using GEO S12 XBOW for stacked setups, insert pins in the two circular holes.REMOVING STANDARD LINK BAR INSERTING PINS - STACKED SETUPS