Lumina 40 Checks and tests2810. Checks and testsThe installer can run a number of tests on the control computer to check the operation of the feeding system.10.1 Weigher testThe working of the installation can be tested using a weigher simulation. Weigher simulation only simulates theweigher's load cell(s).The installation can be 'dry run' tested - i.e. without feed. The installation runs just like during a normal feed process,but without using any feed. This can be used to test the weigher's load cell before the installation is actually used.With a weigher test ensure:• All the augers must be activated.• If using a separate weigher Ensure no feed can enter the weigher.• If the installation also contains a hopper, make sure you operate the sensor in the hopper at the right moment(otherwise an alarm will occur).Set the weigher test in the menu Installer WEIGHER tab page General, at Weigher simulation.See Weigher page 16 for the settings.