System Setup3-8Part 1604857-04 2014 Nordson CorporationFeed Hopper and Wall/Rail Mount System SetupThis procedure applies to mobile systems, and wall or rail mount systemssupplied with powder from a feed hopper.1. Unclamp the hopper lid and take out the vent hose and hose clamps.Re-clamp the lid.2. Unpack the pump, powder hose, air tubing, clamps, and Velcro strapsshipped with the system.3. See Figure 3-4. Plug the following into the controller: 8-mm blue atomizing air tubing (4) 8-mm black flow-rate air tubing (6) 6-mm blue fluidizing air tubing (9)4. See Figure 3-9. Route the atomizing air (4) and flow-rate tubing (6)through the grommet (12) on the front panel of the cart tower.5. Route the fluidizing air (9) tubing through the tower and out the bottomfront.6. Mobile systems: Install the hopper on the cart platform, in between theretainer tabs.7. Install the pump (7) into the pump mount (5) with a slight twistingmotion. Connect the fluidizing and atomizing air tubing to the pump asshown.NOTE: Rail mount systems are shipped with a pump adapter kit and acoupling for use with pickup tubes designed for other pumps. Refer to theinstallation instructions on page 3-10.8. Connect the 10-mm x 6-mm reducer (11) to the 10-mm elbow fitting onthe hopper fluidizing pan. Connect the fluidizing air tubing (9) to thereducer.9. Connect the ring-tong terminal on the green/yellow ground wire (10) tothe ground stud on the side of the fluidizing pan, then plug the groundwire into the grounding socket on the cart base.10. Install a hose clamp (8) over the end of the vent hose (1) and connectthe hose to the vent stack on the lid. Tighten the clamp to secure thehose.11. Connect the powder hose (2) to the pump and secure it with a hoseclamp (3).NOTE: The pump is equipped with quick-connect couplings that allow youto quickly disconnect the air tubing when cleaning or repairing the pump.Pull back on the knurled coupling rings to uncouple them.