Installation and connections 2-41Appendix 1 to 553-2601-200Chart 2-9QCAD321 JUNCTION BOX ASSEMBLY INSTALLATIONThe QCAD321 junction box assembly is equipped with power and control wiring enclosed in aflexible conduit 5.5 ft (1675 mm) long. The junction box should be installed on the floor or onthe wall within 5 ft (1525 mm) of the cabinet.When suppression of Electromagnetic Interference (EMI) is a requirement, wiring should be runin metallic conduit between the QBL15 battery distribution box and the QCAD321 junction boxassembly. The QBL15 battery distribution unit and the junction box are capable of accepting11/4 in conduit.STEP PROCEDUREThe QBL15 battery distribution units should be installed before attempting to install theQCAD321 junction box assembly.1 Unpack the QCAD321 junction box assembly and dispose of the packing material.2 Mount the junction box on a wall or locate on floor within 5 ft (1525 mm) of thecabinet.3 Remove screws securing cover to function box and remove cover.4 Remove front and rear covers from cabinet.5 Service in the cabinet will be interrupted when performing this step on an operatingcabinet.Set the AC BRKR breaker on the faceplate of the -48 V rectifier in the cabinet to OFF.Set breakers on the faceplates of the power distribution units (QUX19, QUX20,QUX21) to OFF.6 If not previously disconnected, disconnect the power line cord from the commercialpower supply.7 Remove the EMI shield (if equipped) from the bottom rear of the cabinet.8 If the first SDI port is equipped with a connector (Fig. 2-9), remove port mountingscrews and pull SDI connector away from cabinet.9 Remove the lock nut from the 90° elbow on the end of the flexible conduit containingwiring from the QCAD321 junction box.10 Insert the wires and the 90° elbow in the hole at the rear of the cabinet to the right ofthe cabinet power cord.Chart Continued