Installation and connections 2-51Appendix 1 to 553-2601-200terminal, such as a Meridian SL-1 cross-connect terminal, they are terminated at thatterminal and extended to the MDF. These leads are then cut off at the MDF.Table 2-DCable D Designations (Transmit)Local and RemoteCarrier Network Card Lead LeadLoop Position Connector Color DesignationD PinNumberA X 9 1 BL-W C5A X 9 26 W-BL C6B X 9 2 O-W C7B X 9 27 W-O C8A Y 9 3 G-W C13A Y 9 28 W-G C14B Y 9 4 BR-W C15B Y 9 29 W-BR C165 5 S-W GND5 30 W-S GND4 6 BL-R PFX14 31 R-BL PFX28 7 O-R PFY18 32 R-O PFY29 8 G-R DCST9 33 R-G DSCR9 9 BR-R DETT9 34 R-BR DETR10 to 25 (Note)35 to 50 (Note)Note: These leads are grounded in the carrier shelf when cable connectors C and D areinstalled in jacks C and D. They are cut off at the MDF when cables C and D go