Testing5-2 7976-A2-GB20-10August 1998Running Network TestsNetwork tests require the participation of your network service provider. Toaccess the Network Tests screen, follow this menu selection sequence:Main Menu →Test →Network & G.703 TestsÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎmain/test/network_G.703HotwireModel: 7976NETWORK & G.703 TESTSTest Command Status Results––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––Local LoopbacksLine Loopback: Start Inactive 00:00:00Payload Loopback: Start Inactive 00:00:00Repeater Loopback: Start Inactive 00:00:00DTE Loopback: Start Inactive 00:00:00Remote LoopbacksSend Line Loopback: Down Send Inactive 00:00:00Pattern TestsSend and Monitor 511 Stop Active hh:mm:ss - Errors 99999+––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––Ctrl-a to access these functions, ESC for previous menu MainMenu ExitResetMonUse the Command column to start or stop a test. When the Status columnshows that a test is Inactive, Start is displayed; when a test is Active, Stop isdisplayed. Position the cursor at the desired Start or Stop command and pressEnter.Selecting Abort All Tests from the Test menu will not disrupt a send and monitor511 test.The Results column displays the test duration.When the Send and Monitor 511 test is active, ResetMon is available to reset theerror counter to zero.