GB-23Pre-Delivery ChecklistProduct No. 70526 - HR 9016 TurboProduct No. 70527 - HR 9016 TurboTractor _________________________Check:Wheel lug torque 65-75 ft. lb. (88 - 102 Nm)Tire pressure should be:Tractor: 20-22 psi (138 -152 kPa)Decks: 20-25 psi (138 - 173 kPa)Hydro linkage neutral centering adjustment(unit must not creep in neutral)Traction pedalParking brakeTurn assist pedalsEngine _________________________Check:Engine oil levelEngine coolant levelAir cleaner element and connectionsBelt adjustmentElectrical System ________________Check:Interlock systemIgnition switchBrake switchPower take-off switchOperator’s seat switchOperation of all remaining switchesPanel gauges and warning lightsFor pinched or rubbing wiresHydraulic System _______________Check:Hydraulic oil levelFor pinched or rubbing hosesFor twisted or crimped hosesFor oil leaksThat tow valve is closedCutting Units __________________Check:All hardware securely fastenedRaise/lower operationPower take-offAdjust cutting height to customers’ requirementsMake sure hoses do not interfere with lift armsMiscellaneous __________________Check for loose or missing hardwareAll lubrication pointsExamine paint finish; touch up where necessaryCheck decals. In place and legibleMake sure Safety & Operation Manual is in pouchMake sure Parts & Maintenance Manual is in pouchThrottle stop locked in MOW positionShould you encounter any areas that required repair during set-up, please explain below and fax (262/635-1067) acopy of the checklist and problem description to us.Problem Description_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________Dealer ______________________________________________ Inspected ______________________________Customer ___________________________________________ Date _________________________________