20 PARAGON II USER G UIDEH. Press F5 to return to the Administration Menu. Select Channel Configuration again.Select a channel port that has been configured for the subsidiary Base Unit you just set up.Press G to activate a dedicated Channel Configuration menu for the subsidiary Base Unit.I. Edit the names of all server CPUs attached to this subsidiary Base Unit. Each highlightshould turn green as you start typing. Press ENTER when finished with each name. PressS to save all of the new names.J. Press F2 to access the dedicated Selection Menu for that subsidiary Base Unit. Verifythat new names appear in the Selection Menu in green.K. If you are configuring a second-tier subsidiary Base Unit, and there are any third-tierBase Units attached to it, repeat steps C through J for a third-tier path. Press S to save theconfiguration. Press F2 to activate the third-tier Selection menu and verify that the third-tier Base Unit is properly configured: Select a channel port for the second-tier path andpress ENTER, then a channel port for the third-tier path and press ENTER, then achannel port for a CPU attached to the third-tier Base Unit and press ENTER. If you canproperly access and operate the chosen CPU, the third-tier Base Unit is properly installed.Note: Repeat step K for all remaining third-tier Base Units (if any) attached to this second-tierBase Unit.L. Press S to save the configuration. Press F2 to activate the Selection menu and verify thatthe second-tier Base Unit is properly configured: Select a channel port for the second-tierpath and press ENTER, then a channel port for a CPU attached to the second-tier BaseUnit and press ENTER. If you can properly access and operate the chosen CPU, thesecond-tier Base Unit is properly installed.M. Repeat steps C through L for all remaining (if any) second-tier Base Units attached to themaster Base Unit.N. Edit the names of any server CPUs directly attached to the master Base Unit and verifythe master Base Unit’s configuration as described in steps 6B through 6E of the sectionInstalling a Paragon II with a Single Base Unit, earlier in this chapter.Important: If you rearrange a cascaded system or dismantle one and rebuild itdifferently later, you must recycle power to each Base Unit in the new cascade. A softreset allows each Base Unit to retain all user and system profiles, and to auto-detectthe current status of its channel port and user ports. Follow the installation steps inthis section to install the new cascade, but when you power on each Base Unit (whichmust be done in proper tier order, from base tier to upper tier), press FUNC on theunit’s front panel until “Clear Database Hit Ent/ESC?” appears on the LCD panel. Pressthe ENT and the ESC buttons sequentially to execute a partial reset on the database.Please see Chapter 2: Installation, Paragon II Front Panel Display and Controls, “PowerUp” section for additional information.