English841Introduce the stirrers with their packing band into thecolumn; once they are placed on the bottom, cut andremove the band.When loading is complete, reinsert the metalcounterweight.Make sure the stirrers have no burrs, are not bent and areall placed horizontally.8.9 Cup supplyUse only cups suitable for automatic dispensing. Do notpress them against each other during the loadingprocedure.Do not try to turn the column manually.When installing, with the cup dispenser empty, proceed asfollows:• remove the cover of the cup dispensing tube.• load two of the most accessible tubes.• replace the cover on the cup columns.8.10 First start-up of the vendingmachineSupply the vending machine (following the instructionsgiven previously) and plug it into the power supply (seesection "Power Grid Connection").At this point the message "ATLANTE" will appear on thedisplay and the self-diagnosis phase is activated to checkthe correct positioning of the machine devices.During the self-diagnosis phase, the following devices are activated:• the brew group, the nozzle arm and the stirrer/sugar dispenser, to get acorrect starting positioning;• if necessary, also the cup release motor and the cup holder will beactivated.Instant products and coffee boilers are refilled also during the initialisationphase (*).When the initialisation is complete the warming phase starts and theheating elements of the boilers are automatically switched on.(*) During the initial start-up of the machine make sure the boilers areactually full by starting the Maintenance and performing a refill of the coffeboiler and a wash cycleCarry out the grinder adjustment as indicated in the instructions atsection "Coffee Grinder Adjustment" after refilling the water circuit.8.11 Water circuit fillingWhen the VM is first switched on, it is necessary to fill theboilers. The instant product boiler (if present) is filledautomatically, while the Coffee boiler has to be filledmanually using the appropriate "BOILER FILL" item of themaintenance menu.