- 154 -Utilities FS-3600 PC WorkStationStarting the “Z Process” From PC WorkstationSelect “Utilities” from the menu:From the Utilities Menu the “Z Report”, “User Z”, “Station Z” and “Revenue Center Z” Reportsare available.Ø Z Report: From the Z Report Menu: Daily, Weekly, and Period Reports areavailable for Sales and Labor. The window that displays when “Z Report” isselected is dependent on the Close with Sales flag located in the FS-3600. (SystemConfiguration, Page 9, Field 6) When labor is configured to close with Sales, theLabor section is removed.• Daily System Z: The Daily System Z is checked to run by default.• Weekly System Z: If the current day is the Week Ending Day, the WeeklySystem Z Report is checked by default and the Daily Z is checked and grayed out.• Period System Z: A Period Z can be selected anytime as needed. When PeriodClose is checked the Daily Z is checked and grayed out.• Daily Labor Z: Daily Labor is NOT checked by default. The Daily Labor Z mustbe checked selected to run the Daily Labor Close.• Weekly Labor Z: If the current day is the Week Ending Day the Weekly Labor Zis checked by default and the Daily Z selection is checked and grayed out.CAUTION: On Week Ending Days, remember to uncheck Close Labor if only aSales Z is desired.• Period Labor Z: A Period Labor Z can be selected anytime as needed. WhenPeriod Close is selected the Daily Z selection is checked and grayed out.Close w/Sales = No Close w/Sales = Yes