0020253094_05 ecoTEC sustain Installation and maintenance instructions 57© Heating and Hotwater Industry Council (HHIC)www.centralheating.co.ukSERVICE & INTERIM BOILER WORK RECORDIt is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers’ instructions, and that the appropriate service /interim work record is completed.Service providerWhen completing a service record (as below), please ensure you have carried out the service as described in the manufacturers’ instructions. Always use theSERVICE/INTERIM WORK ON BOILER delete as appropriate Date:Engineer name: Company name:Telephone No : Gas Safe registration N o :Max rate CO ppm CO² % CO/CO²Min rate CO ppm CO² % CO/CO²undertaken in accordance with manufacturers’instructions, and readings are correct?”yesGas rate: m3 /h OR ft3 /hdelete as appropriate Yes NoSystem inhibitor concentration has been checked andappropriate action taken, in accordance with BS 7593and boiler manufacturers’ instructions. *yes n/aComments:Signature:instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineersattendance visit was in between annual services to attend a non-water facing component.instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineersattendance visit was in between annual services to attend a non-water facing component.instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineersattendance visit was in between annual services to attend a non-water facing component.instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineersattendance visit was in between annual services to attend a non-water facing component.instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineersattendance visit was in between annual services to attend a non-water facing component.instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineersattendance visit was in between annual services to attend a non-water facing component.SERVICE/INTERIM WORK ON BOILER delete as appropriate Date:Engineer name: Company name:Telephone No : Gas Safe registration N o:Max rate CO ppm CO² % CO/CO²Min rate CO ppm CO² % CO/CO²undertaken in accordance with manufacturers’instructions, and readings are correct?”yesGas rate: m3/h OR ft3 /hdelete as appropriate Yes NoSystem inhibitor concentration has been checked andappropriate action taken, in accordance with BS 7593and boiler manufacturers’ instructions. *yes n/aComments:Signature:SERVICE/INTERIM WORK ON BOILER delete as appropriate Date:Engineer name: Company name:Telephone No : Gas Safe registration N o :Max rate CO ppm CO² % CO/CO²Min rate CO ppm CO² % CO/CO²undertaken in accordance with manufacturers’instructions, and readings are correct?”yesGas rate: m3 /h OR ft3 /hdelete as appropriate Yes NoSystem inhibitor concentration has been checked andappropriate action taken, in accordance with BS 7593and boiler manufacturers’ instructions. *yes n/aComments:Signature:SERVICE/INTERIM WORK ON BOILER delete as appropriate Date:Engineer name: Company name:Telephone No : Gas Safe registration N o:Max rate CO ppm CO² % CO/CO²Min rate CO ppm CO² % CO/CO²undertaken in accordance with manufacturers’instructions, and readings are correct?”yesGas rate: m 3/h OR ft3/hdelete as appropriate Yes NoSystem inhibitor concentration has been checked andappropriate action taken, in accordance with BS 7593and boiler manufacturers’ instructions. *yes n/aComments:Signature:SERVICE/INTERIM WORK ON BOILER delete as appropriate Date:Engineer name: Company name:Telephone No : Gas Safe registration N o :Max rate CO ppm CO² % CO/CO²Min rate CO ppm CO² % CO/CO²undertaken in accordance with manufacturers’instructions, and readings are correct?”yesGas rate: m3 /h OR ft3/hdelete as appropriate Yes NoSystem inhibitor concentration has been checked andappropriate action taken, in accordance with BS 7593and boiler manufacturers’ instructions. *yes n/aComments:Signature:SERVICE/INTERIM WORK ON BOILER delete as appropriate Date:Engineer name: Company name:Telephone No: Gas Safe registration N o :Max rate CO ppm CO² % CO/CO²Min rate CO ppm CO² % CO/CO²undertaken in accordance with manufacturers’instructions, and readings are correct?”yesGas rate: m3 /h OR ft3 /hdelete as appropriate Yes NoSystem inhibitor concentration has been checked andappropriate action taken, in accordance with BS 7593and boiler manufacturers’ instructions. *yes n/aComments:Signature: