61© Vallox Oy - All rights reserved61© Vallox Oy - All rights reservedInstalling the ventilation unit tothe ceiling mounting plate1. Push the locking plates (B) that come withthe ceiling mounting plate (A) between theedging of the side panels and the top ofthe unit so that the perforation (C) pointstowards the front edge of the unit.2. Fasten the locking plates in place withscrews (D) (4 pcs).3. Install condensing water insulation (E)between the unit and the ceiling mountingplate. In the case of Vallox 110 MV installit on the outlet collars, and in the caseof Vallox 096 MV install it directly on theceiling installation plate.4. Lift the unit and take the wires through theopening in the ceiling mounting plate.5. Put the locking devices to the top of theventilation unit at the openings in the ceilingmounting plate and lift upward. Make surethat the unit is locked in place.6. Check that the condensing water insulationbetween the unit and the ceiling mountingplate is in place in the ducts.Attic floor penetration plateThe attic floor penetration plate (F) is optional.When an attic floor penetration plate is used,the tightness of the vapour barrier has to beensured.The minimum distance of the attic floorpenetration plate from the rear wall is 5mm. Theminimum distance of the attic floor penetrationplate from the side walls is 15mm.096 MV - 544mm110 MV - 582mm096 MV - min. 4mm110 MV - min. 8mm096 MV - 332mm110 MV - 375mm096 MV - 600mm110 MV - 638mmmax. 10mmINSTALLATIONBED4xFA096110CCTIPYou can detach the unit from the ceilingmounting plate by pulling the spring-loadedmoulding to the direction shown by thearrow (more detailed information providedwith the ceiling mounting plate).