G 50/G 70/G 85 Operationwc_tx000483gb.fm 373.19 Before StartingBefore putting the generator into service, review each item on thefollowing checklist. Because generators are often run for long periodsof time unattended, it is important to make sure that the unit is set upproperly to reduce possible problems.Failure to follow the procedures listed may cause injury to personnel ordamage to the generator. Be certain that all persons setting up thegenerator are certified or fully trained on the installation of thegenerator.• Check for any damage that might have been caused during shippingor towing.• Check to make sure no debris has lodged in vents, near radiator oraround fan. Check to make sure that the exhaust compartment isclean and nothing is touching the muffler or exhaust pipes.• Check that generator is level.• Chock trailer wheels.• Check that generator is grounded to a good earthen ground per localregulations and NEC standards.• Check engine oil, coolant and fuel levels, and fill as required.• Determine voltage needs. Set voltage selector switch and makecorrect terminal connections.• Check that all electrical connections were made in compliance withlocal regulations and NEC standards.• Check fan belt and hoses on engine for loose connections or fraying.Tighten or replace as required.• Close and secure side panel access doors.• Review and follow safety instructions found in the front of this manual.WARNING