2 Connect the duct system to the panel flanges.Minimum clearance above the unitThe unit is designed to be installed outdoors.In ground level installations, the building eaves should be at a vertical distance of at least 1830 mm fromthe top of the unit and should not overhang the unit more than 915 mm.There are no restrictions regarding the overhang if the eaves are 3000 mm or more above the unit.1.10.2 General dimensions and ac‐cesses (models 045/060)A. Combustion exhaust hoodB. Combustion air input hoodC. Access to gas heating systemD. Gas supply intake (∅ 58 mm), with rubber grommetE. RAG/RAD unit detailsF. Access to motor, fan and pulleysG. Access to heating optionsH. Access to control systemI. Control cable intake (∅ 23 mm) (side)J. Power cable intake (∅ 38 + 29 mm) (side)K. Opening for connection of lower supply and return air ducts.L. Control cable intake (PG 21 mm) (lower)M. Power cable intake (PG 48 mm) (lower)Installation manual 1Measurements, clearances and accesses 1.1011