Harsco Industrial P-K SONIC SC-3000 manuals
P-K SONIC SC-3000
Table of contents
P-K SONIC SC-3000
Table of contents
- Table Of Contents
- safety features
- hazard warnings
- receiving and storage
- inlet air and exhaust venting
- gas piping
- boiler water piping
- safety checks
- initial nuro control setup & adjustment
- normal lighting and shut-down procedures
- maintenance and inspections schedule
- cleaning the burner & combustion chamber
- after repairs or maintenance
- sequence of operation
- troubleshooting
- wiring diagrams
- boiler parts identification (sc)
- boiler parts identification (sc-3000 & sc)
- limited warranty
- appendix 1: maintenance log
P-K SONIC SC-3000
Table of contents
- safety precautions
- hazard warnings
- Table Of Contents
- Table Of Contents
- Table Of Contents
- using this manual
- site preparation
- Placement
- I NLET A IR AND E XHAUST V ENTING C ONSIDERATIONS
- Gas Vent Category Planning
- Required Clearances
- Interior Component Clearances
- electrical connections
- Single Phase Power Supply Connection (SC-1500 and SC-2000 Only)
- Three Phase Power Supply Connection (SC-3000 & SC-4000 Only)
- High Voltage (TB2) Terminal Block
- Low Voltage (TB1) Terminal Block
- combustion air
- Air Inlet Requirements
- Canadian Considerations
- Flue Venting Installation
- vent termination
- Venting for Multiple Boilers
- Inlet Duct Connection to Boiler
- Category IV Installations
- removing an existing boiler
- Piping
- boiler water piping
- water quality
- safety checks
- Ignition Safety System Test
- Manual Reset High Temperature Limit Test
- Introduction
- Information Screen
- Comfort Heat Operation
- Combustion Setup and Adjustment
- Adjusting Low Fire
- OPERATIONS
- Normal Lighting Procedures
- MAINTENANCE
- P REVENTIVE M AINTENANCE
- Monthly Preventive Maintenance
- A FTER R EPAIRS OR M AINTENANCE
- sequence of operations
- troubleshooting
- Flame Failure
- T ERMINAL B LOCK A SSIGNMENTS AND W IRING D IAGRAMS
- Terminal Block Assignments — High Voltage (TB2) Terminal Block
- Terminal Block Assignments — Low Voltage (TB1) Terminal Block
- SC-3000 & SC-4000 Control Transformer Diagrams
- SC-3000 & SC-4000: 440-480 VAC, Three Phase, 60 Hertz
- SC-1500 & SC-2000 Wiring Diagram
- SC-3000 & SC-4000 480V Wiring Diagram
- Main Boiler Assembly (SC-1500 & SC-2000)
- NURO Control Panel (SC-1500 & SC-2000)
- Heat Exchanger Assembly (SC-1500 & SC-2000)
- Natural Gas Train, Burner & Blower Assembly (SC-1500 & SC-2000)
- B OILER P ARTS I DENTIFICATION (SC-3000 & SC-4000)
- NURO Control Panel (SC-3000 & SC-4000)
- Main Power Box (SC-3000 & SC-4000)
- Heat Exchanger Assembly (SC-3000 & SC-4000)
- Natural Gas Train, Burner & Blower Assembly (SC-3000 & SC-4000)
- Propane Gas Train (SC-3000 & SC-4000)
- limited warranty
- BOILER FIRE-TEST REPORT
- APPENDIX A – MAINTENANCE LOG
- APPENDIX B – BOILER ALTITUDE DERATE SCHEDULE
- APPENDIX C – WATER QUALITY STANDARDS QUALITY STANDARDS FOR HYDRONIC BOILERS IN MULTI-METAL SYSTEMS
- exhaust venting
P-K SONIC SC-3000
Table of contents
- safety precautions
- hazard warnings
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- P URPOSE OF THIS D OCUMENT
- SITE PREPARATION
- C OMPLIANCE WITH C ODES
- L OCATION S ETUP
- Clearances
- I NLET A IR AND E XHAUST V ENTING C ONSIDERATIONS
- Category II/IV Flue Gas Exhaust Vent Planning
- Venting Materials for Flue/Exhaust Systems
- Required Clearances
- G AS P IPING C ONSIDERATIONS
- Appliance Connections (SC-1500 & SC-2000)
- E LECTRICAL C ONNECTIONS
- Power Requirements (SC-3000 & SC-4000)
- High Voltage (TB2) Terminal Block (SC1500 & SC2000)
- High Voltage (TB2) Terminal Block (SC3000 & SC4000)
- Low Voltage (TB1) Terminal Block
- C OMBUSTION A IR
- Air Inlet Requirements - Canada
- Direct Vent / Sealed Combustion Installations
- Motorized Combustion Air Dampers
- Flue Ga / Exhaust Venting
- Vent Termination
- Venting for Multiple Boilers
- Sealed Combustion/Direct Vent Systems
- Category IV Installations
- R EMOVING AN E XISTING B OILER
- Piping
- Natural Gas Piping
- Boiler Water Piping
- Boiler Water Piping (for Installer)
- Water Quality
- S AFETY C HECKS
- Manual Reset High Temperature Limit Test
- F UEL /A IR A DJUSTMENTS
- Manual Control Mode for High and Low Fire Adjustment
- Adjusting High Fire
- I NITIAL NURO C ONTROL S ETUP AND A DJUSTMENT
- Home Screen
- Setup Wizard
- DUAL FUEL BOILER OPERATION
- P-K SONIC SC1500GG & SC2000GG
- Fuel Selector Switch Location
- P-K SONIC SC3000-SC4000
- OPERATIONS
- N ORMAL L IGHTING AND S HUT - DOWN P ROCEDURES
- MAINTENANCE
- Monthly Preventative Maintenance
- I NSPECTION S CHEDULE
- M AINTENANCE
- sequence of operations
- Loss of Water Level
- Flame Failure
- PARTS/TECHNICAL SUPPORT
- SSIGNMENTS
- Terminal Block Assignments — High Voltage (TB2) Terminal Block
- W IRING D IAGRAMS SC-1500 & SC-2000 Natural Gas or Propane Gas
- SC-1500 & SC-2000 Dual Fuel
- Wiring Diagram – Power Box (SC-3000 and SC-4000 Only)
- SC-3000 & SC-4000 Control Transformer Diagrams
- SC-3000 & SC-4000 240V Natural Gas or Propane Gas
- SC-3000 & SC-4000 240V Dual Fuel
- SC-3000 & SC-4000 480V Natural Gas or Propane Gas
- SC-3000 & SC-4000 480V Dual Fuel
- NURO Control Panel (SC-1500 & SC-2000)
- Heat Exchanger Assembly (SC-1500 & SC-2000)
- Natural Gas Train, Burner & Blower Assembly (SC-1500 & SC-2000)
- Propane Gas Train, Burner & Blower (SC-1500 & SC-2000)
- 1004905978 P-K SONIC NURO Installation and
- NURO Control Panel (SC-3000 & SC-4000)
- Main Power Box (SC-3000 & SC-4000)
- Heat Exchanger Assembly (SC-3000 & SC-4000)
- Natural Gas Train, Burner & Blower Assembly (SC-3000 & SC-4000)
- Propane Gas Train (SC-3000 & SC-4000)
- BOILER FIRE-TEST REPORT
- APPENDIX A – MAINTENANCE LOG
- APPENDIX B – BOILER ALTITUDE DERATE SCHEDULE
- APPENDIX C – WATER QUALITY STANDARDS QUALITY STANDARDS FOR HYDRONIC BOILERS IN MULTI-METAL SYSTEMS
- APPENDIX D – BEST PRACTICES FOR NEW & RETROFIT SYSTEMS
- APPENDIX E – INSTALLATION AND QUICK REFERENCE
- A PPLIANCE C ONNECTIONS (SC-1500 & SC-2000)
- H YDRONICS /W ATER F LOW
- P ROPYLENE G LYCOL F LOW
manualsdatabase
Your AI-powered manual search engine