Chapter 9. Maintaining Units162 3ware Serial ATA RAID Controller User GuideYou can also set the rate at which background tasks are performed comparedto I/O tasks. For more information, see “Setting Background Task Rate” onpage 160.Scheduled Task DurationIf a rebuild completes within a scheduling window, it will not start over at thenext scheduled time block, unless another rebuild is required.If a rebuild does not complete in the scheduled time block, it will continuewhere it left off at the next scheduled time block.Similarly, if a verify operation does not complete in the scheduled time block,it will continue where it left off at the next scheduled time block.Viewing Current Task SchedulesYou can see the current schedules for background tasks on the Schedulingpage.To view the current task schedule1 Choose Management > Schedule from the menu bar.The Scheduling page appears, showing the schedule for Rebuild Tasks.(Migration and initialization tasks follow the Rebuild Task schedule.)2 To view Verify Tasks or Self-test Tasks, select it from the drop-down listat the top of the page.Tip: If you want to change a task schedule window, you first remove the scheduleitem and then add it back with the desired day, time, and duration.Note: Setting up the scheduling window does not actually request backgroundtasks. It simply specifies when they can run. For more information about thebackground tasks themselves, see “Background Tasks” on page 147.