About this manual15Installation and commissioning flowchartTask SeePlan the installation.Check the ambient conditions, ratings, requiredcooling air flow, input power connection, compatibilityof the motor, motor connection, and other technicaldata.Select the cables.Planning the cabinet assembly (page 23)Planning the electrical installation (page 37)Technical data (page 71)Option manual (if optional equipment isincluded)Unpack and check the units.Check that all necessary optional modules andequipment are present and correct.Only intact units may be started up.Mechanical installation: Contents of thepackage (page 29)If the converter has been non-operational formore than one year, the converter DC linkcapacitors need to be reformed. Ask ABB formore information.Check the installation site. Mechanical installation: Before installation(page 30)Technical data (page 71)If the drive is about to be connected to an IT(ungrounded) or corner-grounded system, check thatthe internal EMC filtering of the drive has beendisconnected.Safety instructions: Installation andmaintenance work (page 6)Install the drive in a cabinet. Mechanical installation: Installation procedure(page 30)Route the cables. Planning the electrical installation: Routing thecables (page 45)Check the insulation of the supply cable, the motorand the motor cable, and the resistor cable (ifpresent).Electrical installation: Checking the insulation ofthe assembly (page 48)