Getting Started Commissioning Procedure2-2 User Manual ML700Commissioning ProcedureTo install the ML unit and equipment properly, use the Installation Guide (provided on MLCD) to assist in the installation. To start the configuration procedure The management host/PC and ML unit must be connected via the CRAFT port. Since theIP addresses of ML devices are initially set (factory default) to 0.0.0.0, the COLAN portcannot be used for telnet connection. The CRAFT port setting on the management host/computer should match the ML device.Initially (after factory setup) all ML devices accept 9600 bps baud rate. See Appendix C with Step-by-Step Commissioning procedure (on page C-1)