Installation and maintenance manual16DAIKIN EKHHP(3/5)00AA2V3DAIKIN Hot water heat pump008.1423444_02 – 09/20153 x Start-up3.1.2 Start the system● Check all the points on the enclosed checklist.Document the test result.● Switch on the power supply at the distributorbox of the house installation for the DAIKIN Hotwater heat pump.● Switching DAIKIN EKHHP on.● Perform a test run:– Allow the temperatures to be displayed(see section 5.2.3).– Test the hot water generation function.Select a higher set hot water temperature sothat the heating function is activated (seesection 5.3.1).● Sign the check list, together with the operator.Only if it is possible to answer all items on thecheck list by Yes, is it allowed to commission andhand over the DAIKIN Hot water heat pump to theoperator.Check list for start-up1. DAIKIN EKHHP system set up in accordance with a permitted installation variant andno damage detected? Yes2. Minimum distance between the DAIKIN EKHHP and other sources of heat (>80°C) of1 m? Yes3. Booster Heater:– Does the mains connection comply with the regulations and is the mains voltage230 volts at 50 Hz?– Has the residual current device been fitted in accordance with the individual coun-try-specific regulations? Yes Yes4. Is the heat exchanger for domestic hot water heating in the DAIKIN EKHHP full andhas it been bled? Yes5. Is the storage tank full with water to the overflow point? Yes6. Is the safety overflow connection connected to an open drain? Yes7. Is the water pressure on the sanitary side < 6 bar? Yes8. Are all hydraulic connections tight (leaks)? Yes9. Have the parameters been set on the controller in accordance with the structural con-ditions, possibly connected accessories and the user stipulations? Yes10. Is the parameter [7-02] set to the value 0? Yes11. Does the installation operate without faults? Yes12. Has the operating manual been handed over, and has the owner been instructed? YesLocation and Date: Signature of installer:Signature of operator: