Eaton 9E UPS (80-200 kVA, 380/400/415V) Installation and Operation Manual 4-1Chapter 4 UPS System Installation4.1 Preliminary Installation InformationRefer to the following while installing the UPS system:• Chapter 3 for cabinet dimensions, equipment weight, wiring and terminal data, and installation notes.• Do not tilt the cabinets more than ±10° during installation.• If perforated floor tiles are required for ventilation, place them in front of the UPS.• The UPS unit is not suitable for IT or corner-earthed power distribution systems.• Suitable for mounting on concrete or other non-combustible surfaces only1. If not already accomplished, use a forklift or pallet jack to move the UPS cabinet to the installation area, oras close as possible, before unloading from the pallet. Insert the forklift or pallet jack forks between thesupports on the bottom of the pallet (see Figure 3-3 for the UPS cabinet centre of gravity measurements).2. Remove four bolts securing the front shipping bracket to the cabinet and four bolts securing the bracket tothe pallet (see Figure 4-1). Remove the front shipping bracket. If installing the cabinet permanently, retainthe shipping bracket and securing hardware for later use.3. Attach the ramp to the front of the pallet (see Figure 4-2):a. Locate the ramp (top panel from wood container), ramp extension, and ramp brackets with M10 bolts.b. Place the ramp against the front of the pallet.c. Attach the ramp extension to the front of the ramp by inserting the tabs on the extension into the slotsat the bottom of the ramp.4. If the leveling feet are not fully retracted, turn the leveling feet until they are retracted.WARNINGInstallation should be performed only by qualified personnel. See installation instructions beforeconnecting to the supply.4.2 Unloading the UPS Cabinet from the PalletThe UPS Cabinet is bolted to a wooden pallet supported by wood skids. To remove the pallet:WARNINGThe UPS cabinet is heavy (see Table 3-1). If unpacking and unloading instructions are not closely followed,the cabinet may tip and cause serious injury.CAUTION• Do not tilt cabinet more than 10° from vertical.• Lift the cabinets only with a forklift or damage may occur.For the following steps, verify that the forklift or pallet jack is rated to handle the weight ofthe cabinet (see Table 3-1 for cabinet weight).NOTE