Installation InstructionsFire Outputs & Battery CheckTHIS TEST WILL ACTIVATE ANY EXTERNAL EQUIPMENTCONNECTED TO THE FRE, FPE OR FIRERELAYS. IF THEACTIVATION OF THE EQUIPMENT ISNOT DESIRED THENTHE EQUIPMENT MUST BE DISABLED, DISCONNECTEDOR POWERED OFF DURING THIS TEST AND RESTOREDONCE THE TEST IS COMPLETE.Measure the battery charger voltage, this should be around27.6V.Disconnect the mains supply and check the following:• Power On (green) indicator is still on.• General fault (amber) indication is on.• Battery/Mains fault indication is on for mains fault.The panel should not lose power during the following test.Activate a call point in any zone.Check the following on the panel:• General fire indicator (red) is on.• Correct zone fire indicator (red) is on.• FRE On indicator (red) is on.• FRE output has switched to 24V (if fitted).• FPE output has switched to 24V (if fitted).• Fire relay has switched over to C/NO.• All fire alarm devices are sounding.Check the following on the interlinked panel (if installed):• General fire indicator (red) is on.• FRE On indicator (red) is on.• FRE output has switched to 24V (if fitted).• FPE output has switched to 24V (if fitted).• Fire relay has switched over to C/NO.• All fire alarm devices are sounding.Perform a soft reset and then check that the panel andinterlinked panel have returned to the normal conditionwith mains fault.WARNINGwww.acornfiresecurity.comwww.acornfiresecurity.com