Terex South Dakota, Inc. USA500 Oak Wood RoadPO Box 1150Watertown, SD 57201-6150(605) 882-4000Copyright © 2011 Terex Corporation. Genie® is a registered trademark of Terex SouthDakota, Inc. 133192 Rev DGenie UKThe Maltings, Wharf RoadGrantham, LincolnshireNG31- 6BH England(44) 1476-584333Pre-DeliverPre-DeliverPre-DeliverPre-DeliverPre-Delivery Preparationy Preparationy Preparationy Preparationy PreparationPre-Delivery Preparation Y N RPre-operation inspectioncompletedMaintenance items completedFunction tests completedModelSerial numberDateMachine ownerInspected by (print)Inspector signatureInspector titleInspector companyInstructionsUse the operator’s manual on your machine.The Pre-delivery Preparation consists of completingthe Pre-operation Inspection, the Maintenance itemsand the Function Tests.Use this form to record the results. Place a check inthe appropriate box after each part is completed.Follow the instructions in the operator’s manual.If any inspection receives an N, remove the machinefrom service, repair and reinspect it. After repair, placea check in the R box.LegendY = yes, completedN = no, unable to completeR = repairedCommentsFundamentalsIt is the responsibility of the dealer to perform thePre-delivery Preparation.The Pre-delivery Preparation is performed prior toeach delivery. The inspection is designed to discover ifanything is apparently wrong with a machine before itis put into service.A damaged or modified machine must never be used.If damage or any variation from factory deliveredcondition is discovered, the machine must be taggedand removed from service.Repairs to the machine may only be made by aqualified service technician, according to themanufacturer's specifications.Scheduled maintenance inspections shall beperformed by qualified service technicians, accordingto the manufacturer's specifications and therequirements listed in the responsibilities manual.