Section 3 • Scheduled Maintenance ProceduresNovember 2014Part No. 229753 GS-2669 RT • GS-3369 RT • GS-4069 RT 3 - 11A-7Perform 30 Day ServiceThe 30 day maintenance procedure is a one-timesequence of procedures to be performed after thefirst 30 days or 40 hours of usage. After thisinterval, refer to the maintenance checklists forcontinued scheduled maintenance.1 Perform the following maintenance procedures:Kubota models:• B-3 Inspect the Tires, Wheels andLug Nut Torque• B-8 Check the Oil Level in the DriveHubs• D-2 Replace the Hydraulic TankReturn FilterPerkins models:• B-3 Inspect the Tires, Wheels andLug Nut Torque• B-4 Perform Engine Maintenance -Perkins Models• B-8 Check the Oil Level in the DriveHubs• C-4 Perform Engine Maintenance -Diesel Models• D-2 Replace the Hydraulic TankReturn FilterA-8Perform Engine Maintenance -Kubota ModelsEngine specifications require that this one timeprocedure be performed after the first 50 hours ofoperation.• Change engine oil• Replace oil filterRequired maintenance procedures and additionalengine information is available in theKubota D1105 Operator's Manual(Kubota part number 16622-89166) OR theKubota WG972 Operator's Manual(Kubota part number EG801-8916-2).Kubota D1105 Operator's ManualGenie part number 131379Kubota DF972 Operator's ManualGenie part number 234803CHECKLIST A PROCEDURES