Section 3 • Scheduled Maintenance ProceduresNovember 2014Part No. 229753 GS-2669 RT • GS-3369 RT • GS-4069 RT 3 - 39CHECKLIST E PROCEDURES13 Clean the inside of the hydraulic tank using amild solvent.14 Install the drain plug using thread sealer on thethreads.15 Install the suction strainer using thread sealer onthe threads.16 Install the hydraulic tank onto the machine.17 Secure the tank with the tank strap. Do not overtighten.18 Install the suction hose onto the tank.19 Install the return filter and head assembly.Note: Replace the return filter if needed.20 Install the return hose to the return filter.21 Fill the tank with hydraulic oil until the fluid iswithin the top 2 inches / 5 cm of the sightgauge. Do not overfill.22 Clean up any oil that may have spilled. Properlydiscard the oil.23 Operate all machine functions through a fullcycle and check for leaks.24 Check the oil level in the tank and add ifneeded.25 Install the tank cover plate and install the tankcover plate mounting fasteners.E-2Perform Engine Maintenance -Perkins ModelsEngine specifications require that this procedure beperformed every 2000 hours.• Inspect alternator• Replace crankcase breather• Inspect engine mounts• Inspect starterRequired maintenance procedures and additionalengine information is available in thePerkins 403D-11 Operator's Manual(Perkins part number SEBU8311-01).Perkins 403D-11 Operator's ManualGenie part number 131661