Service Manual April 2016Pre-Delivery Preparation ReportFundamentalsIt is the responsibility of the owner or dealer toperform the Pre-delivery Preparation.The Pre-delivery Preparation is performed prior toeach delivery. The inspection is designed todiscover if anything is apparently wrong with amachine before it is put into service.A damaged or modified machine must never beused. If damage or any variation from factorydelivered condition is discovered, the machinemust be tagged and removed from service.Repairs to the machine may only be made by aqualified service technician, according to themanufacturer's specifications.Scheduled maintenance inspections shall beperformed by qualified service technicians,according to the manufacturer's specifications andthe requirements listed in the responsibilitiesmanual.InstructionsUse the operator’s manual on your machine.The Pre-delivery Preparation consists ofcompleting the Pre-operation Inspection, theMaintenance items and the Function Tests.Use this form to record the results. Place a check inthe appropriate box after each part is completed.Follow the instructions in the operator’s manual.If any inspection receives an N, remove themachine from service, repair and re-inspect it. Afterrepair, place a check in the R box.LegendY = yes, acceptableN = no, remove from serviceR = repairedCommentsPre-delivery Preparation Y N RPre-operation inspection completedMaintenance items completedFunction tests completedModelSerial numberDateMachine ownerInspected by (print)Inspector signatureInspector titleInspector company