Service Manual April 2016Checklist A Procedures22 Z-34/22 Bi-Energy Part No. 139234A-6Perform 30-Day ServiceThe 30-day maintenance procedure is a one timeprocedure to be performed after the first 30 days or40 hours of usage. After this interval, refer to themaintenance tables for continued scheduledmaintenance.• A-10 Grease the Turntable RotationBearing and Worm Drive Gear• B-4 Inspect the Tires, Wheels and Lug NutTorque• D-2 Check the Turntable Rotation BearingBolts• D-6 Replace the Hydraulic FiltersA-7Perform Engine MaintenanceEngine specifications require that this one–timeprocedure be performed after the first 50 hours ofoperation.• Engine oil• Oil filter• Fuel hoses and clamp bands - checkRequired maintenance procedures and additionalengine information are available in the followingOperator and Maintenance manuals.Kubota - Z482-EGenie part number 52958