4 - Sprayer setup45TransportTransport lock Eagle/TR4 boomThe transport position can be set independently to obtain differenttransport heights.To change position:1. Lift and unfold inner sections till lock is disengaged.2. Lower the boom completely.3. Loosen and remove the two bolts, which keep the parts (X) and (Y)assembled.4. Reassemble (X) and (Y) according to desired hole combination.5. Recommended setting is when leaving 170 mm exposed fromparalift cylinder ram.μ ATTENTION! Always use both bolts to assemble the lock. Thesetting must be identical on both sides.μ ATTENTION! The rear settings must correspond to the frontsettings so the boom is resting on the front as well as rear brackets.± WARNING! The max. transport height must never exceed 4.0 m. Always measure the actual total height and choosesettings not exceeding 4.0 m.Transport lock boom FTZ, B3The boom is mechanically held in transport position with paralift lockmechanisms that automatically engage when the first outer isclosing. The folded channel-section locks are fixed to the top paraliftarm and engage directly on the top of the paralift cylinders whenlowered for transport. This means the boom is not supported byhydraulic oil pressure when in transport.± WARNING! Paralift locks should be checked before and aftertransport to ensure positive lock engagement.± WARNING! When the sprayer is being transported along roughroad and is bounced over pot holes, in extreme cases there isa risk that the lock arms can disengage.