4 – InstallationiSR6142 Router Installation4-4 SN0051102-00 ASPre-installation Check ListDuring the initial configuration process, the system prompts you for theparameters listed in Table 4-2. Fill out the table before installation to expedite theconfiguration process.Mount the RouterYou can place the router on a flat surface or mount it in a standard 19-inchElectronic Industries Association (EIA) rack. See the product specification forweight and dimensions. Rack mounting requires a QLogic rack mounting kit (PartNo. ISR614X-RACKKIT). Contact QLogic for more information.If you mount the router in a closed or multi-unit rack assembly, make sure that theoperating temperature inside the rack enclosure does not exceed the maximumrated ambient temperature for the router.Table 4-2. Pre-installation ChecklistSymbolic name of this routerManagement port IP address(if not using DHCP)Management port subnet mask (if notusing DHCP)Management port gateway IP address (ifnot using DHCP)iSCSI Port 1 (GE-1) IP addressiSCSI Port 1 (GE-1) subnet maskiSCSI Port 1 (GE-1) gateway IP addressiSCSI Port 1 (GE-1) iSNS a IP addressa Internet Storage Name ServiceiSCSI Port 2 (GE-2) IP addressiSCSI Port 2 (GE-2) subnet maskiSCSI Port 2 (GE-2) gateway IP addressiSCSI Port 2 (GE-2) iSNS IP address