P36E-4 Zero Clearance Direct Vent Gas Fireplace 11The clearances listed below are Minimum distances unless otherwise stated:A major cause of chimney related fires is failure to maintain required clearances (air space) to combustible materials. It is of the greatestimportance that this fireplace and vent system be installed only in accordance with these instructions.Clearance to Combustibles from:Back 0" (0mm)Side 0" (0mm)Floor 0" (0mm)NOTE: The minimum floor clearance must be maintained from the top surface of the carpeting, tile, etc.Minimum Clearance from Top of Unit to:Ceiling from top of unit. 32" (1016mm)Side Wall Clearances:Bay or Flush Front 6"* (152mm)Cast Faceplate 6"* (152mm)Kensington Front 6"* (152mm)Balmoral 6"* (152mm)Full Screen Doors 6"* (152mm)* Measured from Surround or Front. See the "Regency Clearances for dimensions" section.Horizontal Vent Clearances:Top 2" (51mm)Side 1-1/2" (38mm)Bottom 1-1/2" (38mm)Vertical Vent Clearances 1-1/4" (32mm)Alcove Clearances**:Max. Depth 36" (914mm)Min. Width 48" (1219mm)Min. Height 72" (1829mm)WARNING: Fire hazard is an extreme risk if these clearances are not adhered to.The HeatWave Duct Kit and the HeatRelease Kit have different clearanceand framing requirements, check theHeatWave and Heat Release manualfor details.Heat Release KitCLEARANCESINSTALLATIONBarcelona & Double Screen Door InstallationsTo install the combination of the Barcelona front and screen doors youmust use non-combustible mantel in conjunction with the alreadyrequired framing specs for the Barcelona front. Steel studs andnon-combustible material on the facing must be adhered to.IMPORTANT: See the "Regency Tripoli Screen Door Series Framing Note" section for framing note on Tripoli Screen Door.