3vacon • 14 Installation of OPTBJ boardLocal contacts: https://www.danfoss.com/en/contact-us/contacts-list/5Unless already done for the other control cables,cut free the opening on the AC drive cover for theOPTBJ cable (protection class IP21).NOTE: Cut the opening on the side of the slot E!6Remount the AC drive cover and run the cable asshown in picture.NOTE: When planning the cable runs, rememberto keep the distance between OPTBJ cables andthe motor cable at a minimum of 30 cm. It is rec-ommended to route the OPTBJ cables away fromthe power cables as shown in the picture.11576_0011572_ukOPTBJcables