1-11 IntroductionThis manual describes site preparation, installation, wiring and set up for TLS-IB consoles. Consult Table 1-1below to determine the sections of this manual that will apply to your TLS-IB console.Related Manuals577013-578 TLS Monitoring Systems Contractors’ Site Preparation Guide576013-858 Direct Burial Cable Installation Instructions577014-031 TLS Magnetostrictive Probes International Installation Instructions577013-744 Mag Plus Probe Installation Guide576013-635 Veeder-Root RS-232 Serial Interface ManualContractor Certification RequirementsVeeder-Root requires the following minimum training certifications for contractors who will install and setup theequipment discussed in this manual:Installer Certification (Level 1): Contractors holding valid Installer Certification are approved to perform wiringand conduit routing; equipment mounting; probe, sensor and carbon canister vapor polisher installation; wirelessequipment installation; tank and line preparation; and line leak detector installation.Technician Certification (Level 2/3): Contractors holding valid Technician Certifications are approved toperform installation checkout, startup, programming and operations training, system tests, troubleshooting andservicing for all Veeder-Root Series Tank Monitoring Systems, including Line Leak Detection. In addition,Contractors with the following sub-certification designations are approved to perform installation checkout, startup,programming, system tests, troubleshooting, service techniques and operations training on the designated system.• Wireless 2• Tall TankWarranty Registrations may only be submitted by selected Distributors.Table 1-1. Applicable Manual Sections By Console Form NumberSection TLS-IB Console Form Number1All234Applies To:846620-180, 846660-180, 846690-180 (RS-232 with IFSF)846620-380, 846660-380, 846690-380 (RS-232 w/o IFSF)5 Applies To:846620-580, 846660-580, 846690-580 (RS-232/RS-485)