Document: DateCreated By: ECO#LPN00585X0001A0_A 2018-04-02TMT 009012INSTALLATION INSTRUCTIONSE-BBD Serieswww.e-conolight.com | 888.243.9445 | FAX: 262.504.5409CAUTIONSIMPORTANT SAFEGUARDSWhen using electrical equipment, basic safetyprecautions should always be followed including thefollowing:READ AND FOLLOW ALLSAFETY INSTRUCTIONS1. DANGER- Risk of shock- Disconnect power beforeinstallation.DANGER – Risque de choc – Couper l’alimentationavant l’installation.2. This luminaire must be installed in accordance with theNEC or your local electrical code. If you are not familiarwith these codes and requirements, consult a qualifiedelectrician.Ce produit doit être installé conformément à NEC ou votrecode électrique local. Si vous n’êtes pas familier avec cescodes et ces exigences, veuillez contacter un électricienqualifié.3. Min. 90°C supply conductors.Les fils d’alimentation 90°C min4. Suitable for mounting within 1.2 M (4 ft) of the ground.Peut être installé à moins de 1,2 m (4 pi) du sol.5. Suitable for operation in ambient not exceeding 40°C.Peut etre utilise a une temperature ambiante n’excedantpas 40°C.6. Suitable for Wet Locations.Adspte pour les Endroits Mouiles.SAVE THESE INSTRUCTIONSFOR FUTURE REFERENCENOTES1. This carton contains fixture, anchor bolts and mount-ing template. See last page for not-to-scale mountingtemplate.FOUNDATIONNOTE: Anchor bolts, template, and Wire-Tie Bracket areattached to base plate for shipping.1. Foundation should be a minimum of 12 inches (305 mm) indiameter, finished level and smooth, with a depth below grade of 24(610 mm) inches. NOTE: in areas where frost is imminent, consultwith a civil engineer for a recommended foundation detail.2. Provided are three 3/8" diameter x 12" (254 mm) long anchor boltsand mounting template (included). Remove base plate from end ofbollard by loosening (DO NOT remove) the 4 set screws at the baseof the bollard with a 1/8” Allen wrench. Template and anchor boltscan be removed from base to allow for installation of anchor bolts.3. Use template to set anchor bolts at proper location (Note conduitentry allowance). Anchor bolts should project 3" (76 mm) aboveconcrete.NOTE: Fixture head does not need to be removed from bollardpole during installation.1. To allow for base plate leveling, before positioning base plate onanchor bolts, thread one leveling nut followed by a washer onto eachanchor bolt. See Figure 1.2. Place base plate over anchor bolts and leveling nuts.3. Position Wire-Tie Bracket on one of the anchor bolts.4. Loosely tighten (3) sets of locking washers and nuts onto ends ofanchor bolts, making sure washer and nut of one of the anchor boltsretains Wire-Tie Bracket.5. Level the base plate by adjusting the leveling nuts under the baseplate. Once leveled, tighten the upper nuts on top of the base plate.6. Place conduit supply wires through the wire-tie in the Wire-TieBracket.7. Make wiring connections per the Electrical Connections section.8. Tighten wire-tie on Wire-Tie Bracket to ensure wiring connections aresupported above ground level. See Figure 2.9. Place bollard tube over base plate.10. Progressively hand tighten 4 set screws at the base of the bollardtube with 1/8" Allen wrench. Once all 4 screws are hand tight, finishtightening screws. See Figure 3.1. Loosen (DO NOT Remove) the 4 set screws under the fixture headusing 1/8" Allen wrench. See Figure 4.2. Rotate the head to reposition 180° shield.3. Progressively retighten all 4 set screws until they are hand tight.Finish tightening screws.BOLLARD INSTALLATIONADJUSTMENT OF SHIELDING FOR180° MODELConcreteFoundation(3) Anchor J-BoltsWiring Conduit(By Others)(3) Sets of LevelingWashers & Nuts3”6”Base Plate(3) Sets of LockingWashers & NutsWire-TieBracketFIGURE 1