IEC07000188 V1 EN-USFigure 66: Test of RTC with I/O13.16 Basic IED functions SEMOD52026-1 v113.16.1 Parameter setting group handling SETGRPS M11369-2 v4Prepare the IED for verification of settings as outlined in section "Preparing fortest" in this chapter.13.16.1.1 Verifying the settings M11369-4 v41. Check the configuration of binary inputs that control the selection of theactive setting group.2. Browse to the ActiveGroup menu to achieve information about the activesetting group.The ActiveGroup menu is located on the local HMI underMain menu/Test/Function status/Setting groups/ActiveGroup3. Connect the appropriate dc voltage to the corresponding binary input of theIED and observe the information presented on the local HMI.The displayed information must always correspond to the activated input.4. Check that the corresponding output indicates the active group.Operating procedures for the PC aided methods of changing the active settinggroups are described in the corresponding PCM600 documents andinstructions for the operators within the SCS are included in the SCSdocumentation.1MRK 502 073-UEN A Section 13Testing functionality by secondary injectionGenerator protection REG670 2.2 IEC and Injection equipment REX060, REX061, REX062 265Commissioning manual