Vizi Beam RXONE MountingADJ Products, LLC - www.adj.com - Vizi Beam RXONE User Manual Page 10When installing the unit, the trussing or area of installation must be able to hold 10 times the weight ofthe unit without any deformation. The unit must be secured with a secondary safety attachment, suchas an appropriately-rated safety cable. Never stand directly below the unit when mounting, removing,or servicing the unit.Overhead mounting requires extensive experience, including calculating working load limits, installa-tion material being used, and perodic safety inspection of all installation material and unit. If you lackthese qualifications, do not attempt the installation yourself.The installation should be checked by a skilled person once a year.The Vizi Beam RXONE is fully operational in three different mounting positions: hanging upside-downfrom a ceiling, sideways on trussing, or set on a flat level surface. Be sure this fixture is kept at least12m (40ft) away from any flammable materials (decoration etc.). Always use and install an appropri-ately-rated safety cable in order to prevent accidental damage and/or injury in the event the clampfails. Never use the carrying handles for secondary attachment.