www.baldormotion.comBasic Installation 3-11MN19433.3 Connector locations3.3.1 Front panel connectors13 Status+14 DGND15 DOUT1+16 DIN2+17 DGND18 DIN1+19 DIN0+20 DGND21 Drive enable+22 Shield23 AGND24 AIN0+1 (NC)2 Data-3 Data+4 GNDX3 Input / OutputUSB1 Status-2 DGND3 DOUT1-4 DIN2-5 DGND6 DIN1-7 DIN0-8 DGND9 Drive enable-10 Shield11 AGND12 AIN0-Node IDThese switches set the MotiFlex e100’snode ID for Ethernet POWERLINK, and thefinal value of the IP address when usingTCP/IP. See sections 5.8.1 and 6.2.4.LEDsThe STATUS, CAN and ETHERNETLEDs are described in section 7.2.1.Tightening torque for terminal block connections (X2 & X3) is 0.5-0.6 N·m (4.4-5.3 lb-in).Tightening torque for option slot 1/2 retaining screws is 0.7 N·m (6.2 lb-in).Maximum wire / ferrule size (X2): 2.5 mm 2 (14 AWG).Maximum wire size (X3): 0.5 mm 2 (20 AWG). Connector X3 is designed to accept bare wires only; do not usebootlace ferrules.(NC) = Not Connected. Do not make a connection to this pin.18 V out / 24 V in0 VX2 18 VDC output / 24 VDC backup inputOption slot 1 retaining screw.Option slot 2 retaining screw.To remove the top cover, push on the center of the bottom edge, then pullthe top edge forwards. To refit, locate the cover over its intended positionand then push on until it snaps into place.To remove the bottom cover, push on the oval indentation and slide thecover downwards. To refit, insert the two tabs, protruding from the cover’stop edge, into the main body. Push on the Baldor label to snap into place.1 TXA2 TXB3 GND4 +7V out5 (NC)6 (NC)X6 RS485 (2-wire)