CT-5322F/CT-5642F User and Installation Guide364. Select Monitor event occurrence.5. Do one of the following: In the From field, enter the date on which you want monitoring of the event to start Click in the field and select the date from the calendar that is displayed6. Do one of the following: In the To field, enter the date on which you want monitoring of the event to end Click in the field and select the date from the calendar that is displayed7. If you want the event to be monitored with no end date, select No end date.8. In the Weekdays field, select the day(s) on which you want the event monitored.9. In the Between field, enter the time range during which you want the event monitored. Use theformat hh:mm-hh:mm, where the first time entry is the starting time and the second time entry isthe finishing time. If multiple time ranges are required, the additional time ranges are separated bya space. For example, hh:mm-hh:mm hh:mm-hh:mm.Note:Events that pass midnight and cross over into the next day must be configured twice: once for thetime period till midnight and the other starting from midnight the next day.10. Click Apply.7.2.4 Sched. Actions (Scheduled Actions)The Responses and Sched. Actions screens are similar, except that the Sched. Actions screen does notinclude the Triggering Event tab. See the Responses section above for details.Each scheduled action includes the following two parameters: Actions – The actions to perform at the scheduled time.Figure 39: Sched. Actions > Actions Tab