36 Installing the PowerConnect Devicew w w . d e l l . c o m | s u p p o r t . d e l l . c o mSite RequirementsThe device can be mounted in a standard 19-inch rack or placed on a tabletop. Before installing thedevice, verify that the location chosen for installation meets the site requirements.• General — Ensure that the power supply is correctly installed.• Power — The device is installed within 1.5 m (5 feet) of a grounded, easily accessible outlet220/110 VAC, 50/60 Hz.• Clearance — There is adequate frontal clearance for operator access. Allow clearance forcabling, power connections and ventilation.• Cabling — Cabling is routed to avoid sources of electrical noise such as radio transmitters,broadcast amplifiers, power lines and fluorescent lighting fixtures.• Ambient Requirements — The ambient unit operating temperature range is 0 to 40ºC (32 to104ºF) at a relative humidity of 10% to 90%, non-condensing. Verify that water or moisturecannot enter the unit casing.UnpackingPackage ContentsWhile unpacking the device, ensure that the following items are included:• The device• An AC power cable• RS-232 crossover cable• Self-adhesive rubber pads• Rack mount kits for rack installation• Documentation CDUnpacking the DeviceTo unpack the device:NOTE: Before unpacking the device, inspect the package and report any evidence of damageimmediately.NOTE: An ESD strap is not provided, however it is recommended to wear one for the followingprocedure.1 Place the container on a clean, flat surface and cut all straps securing the container.2 Open the container or remove the container top.3 Carefully remove the device from the container and place it on a secure and clean surface.4 Remove all packing material.