UPS System Installation4-4 Eaton 93PM UPS (60–100 kW, 480V) Installation and Operation Manual P-164000227—Rev 2 www.eaton.com/powerqualityFigure 4-2. Removing the Sidecar Pallet Skids and Supports – Eaton 93PM UPS4.3 Integrated Battery Cabinet InstallationIf installing Integrated Battery Cabinets (IBCs), refer to the Eaton 93PM Integrated Battery Cabinet InstallationManual listed in paragraph 1.8 for installation instructions.After the IBC is installed, proceed, to paragraph 4.4 if installing an Sidecar Integrated Accessory Cabinet-Bypass(SIAC-B), or to paragraph 4.5 if installing an Integrated Accessory Cabinet-Distribution (IAC-D); otherwise,proceed to paragraph 4.6 to complete the wiring of the UPS.4.4 Sidecar Integrated Accessory Cabinet-Bypass InstallationIf installing an SIAC-B, refer to the Eaton 93PM Sidecar Integrated Accessory Cabinet-Bypass Installation andOperation Manual listed in paragraph 1.8 for installation instructions.After the SIAC-B is installed, proceed to paragraph 4.5 if installing Integrated Accessory Cabinet-Distribution;otherwise, proceed to paragraph 4.6 to complete the wiring of the UPS.4.5 Integrated Accessory Cabinet-DistributionIf installing Integrated Accessory Cabinet-Distribution (IAC-D), refer to the Eaton 93PM Integrated AccessoryCabinet-Distribution Installation and Operation Manual listed in paragraph 1.8 for installation instructions.After the IAC-D is installed, proceed to paragraph 4.6 to complete the wiring of the UPS.SidecarMounting Bolts(2 places front)(2 places rear)SidecarPallet SkidSidecar SkidMounting Bolts(2 places front)(2 places rear)Sidecar RearCabinet SupportSidecar FrontCabinet Support