Installation Plan and UnpackingEaton 93PM Integrated Battery Cabinet-Small Welded (IBC-SW) Installation Manual P-164000639—Rev 1 www.eaton.com/powerquality 3-1Chapter 3 Installation Plan and UnpackingUse the following basic sequence of steps to install the Eaton 93PM Integrated Battery Cabinet–Small Welded (IBC–SW):1. Create an installation plan for the IBC–SW.2. Prepare your site for the IBC–SW.3. Inspect and unpack the IBC–SW.4. Unload and install the IBC–SW, and wire the system.5. Complete the Installation Checklist.6. Have authorized service personnel perform preliminary operational checks and start up the system.3.1 Creating an Installation PlanBefore installing the IBC–SW, read and understand how this manual applies to the system being installed. Usethe procedures and illustrations in this section and Chapter 4, “Installation” to create a logical plan for installingthe IBC–SW. This section contains the following information:l Physical features and requirements, including dimensionsl Power wiring installation notesl Location of conduit and wire entry landing platesl Location of power terminals3.2 Preparing the SiteFor the UPS system to operate at peak efficiency, the installation site should meet the environmentalparameters outlined in this manual. The operating environment must meet the weight, clearance, andenvironmental requirements specified.3.2.1 Environmental and Installation ConsiderationsThe UPS system installation, including the IBC–SW, must meet the following guidelines:l The system must be installed on a level floor suitable for computer or electronic equipment.l The system must be operated at an altitude no higher than 1500m (5000 ft) without derating. For additionalinformation and assistance with high altitude operation, contact an Eaton service representative (seeparagraph 1.8).l The system must be installed in a temperature and humidity controlled incover area free of conductivecontaminants.l Specifications are subject to changeFailure to follow guidelines may void your warranty.NOTE Startup and operational checks must be performed by an authorized EatonCustomer Service Engineer, or the warranty terms specified on page W-1 becomevoid. This service is offered as part of the sales contract for the UPS. Contact anEaton service representative in advance (a minimum two-week notice is required)to reserve a preferred startup date.