EXTERNAL BATTERY CABINET INSTALLATIONEaton FERRUPS FE/QFE UPS (500 VA–18 kVA) Installation Guide 164201403 Rev Bwww.eaton.com/powerquality56 Align the cables on the battery terminals so that the cable lug will not contact any partof the cabinet even if the battery is moved. Keep the cable away from any sharp metaledges. Install the battery cables so they cannot be pinched by the external battery cabinet orUPS doors. Verify that the fuse is positioned so that it will not contact any cabinet parts or otherbattery posts if the batteries should move. Confirm that that there is enough clearancewhen the cabinet door closes. The external battery cabinet chassis (ground or earth) must be connected to the UPSchassis (ground or earth). If you use conduit, this ground conductor must be routed in thesame conduit as the battery conductors. Where conductors may be exposed to physical damage, protect the conductors inaccordance with ANSI/NFPA 70-1993. If you are replacing batteries or repairing battery connections, follow the procedure inthe Eaton FERRUPS FE/QFE UPS (500 VA–18 kVA) User's Guide to shut off your UPS andremove both AC and DC input power.Before Installing the BatteriesThe following items are required for battery installation. Use only toolswith insulated handles: Torque wrench calibrated in inch pounds or Newton meters Petroleum jelly or conductive grease Brush (to apply petroleum jelly or conductive grease to terminals) Pliers 9 extension Standard and Phillips screwdrivers Volt-ohm meter Hammer 7/16 socket wrench Electrical tape Ratchet