EXTERNAL BATTERY CABINET INSTALLATIONEaton FERRUPS FE/QFE UPS (500 VA–18 kVA) Installation Guide 164201403 Rev Bwww.eaton.com/powerquality605. Arrange the batteries in the cabinet or rack. If optional straps areincluded, install the straps as shown in the battery installationdiagram that came with the batteries.Arrange the batteries so there is as much air flow as possiblearound the batteries and so the batteries can be cooled as much aspossible.Some external battery cabinets have cooling slots cut in the shelvesto increase air flow. Arrange the batteries so these slots are notblocked. Some larger batteries must sit with the longest batterydimension in the same direction as the longest shelf dimension.These batteries will partly block the cooling slots. However, if youplace the batteries next to the outside edge of the shelf to leave asmuch space between the batteries as possible, there will be plentyof air flow for cooling.C A U T I O NNever install the batteries in an air-tight enclosure.6. All FE and QFE models with external batteries use a fuse in theexternal battery cabinet. The external battery cabinet fuse protectsthe battery cables. The battery installation diagram shows the fusetype and position. A system DC fuse is inside the UPS.Connect the DC fuse(s) as shown in the battery installation diagram.(The fuse may be on the terminal strip.)7. Find the battery cable assembly that connects to the UPS. (If youhave a removable DC plug at the UPS end, note that this end of thecables does not go through the conduit or connect to it.)Do not connect the external battery cables to the UPS at this time,but pull them through the conduit from the UPS to the cabinet orrack. Do not connect the cables to the batteries or cabinet terminalsyet.If you have more than one external battery cabinet, find the batterycable assembly that will connect the external battery cabinets. Pullthe cables through the conduit that you installed between thecabinets.