2 Eaton 93PM Integrated Battery Cabinet-Small Welded (IBC-SW) Installation Manual 164000639—Rev 0311..11 IInnssttaallllaattiioonn FFeeaattuurreess• Line-up-and-match configurations using factory supplied power wiring or standalone configurations usingcustomer supplied power wiring• Battery wiring can be run internally through the left or right sides of the IBC–SWs in line-up-and-matchconfigurations, or routed through the top or bottom of the IBC–SWs using conduit in standaloneconfigurations• Front access panel for access to the battery breaker• Interface wiring can be routed through the top left or right sides of the IBC–SWs in line-up-and-matchconfigurations or through the top or bottom of the IBC–SWs using conduit in standalone configurations• Built-in casters for easy cabinet placement• Cabinet bolt holes are provided for permanently mounting the IBC–SW using the optional Floor MountBracket KitLine-up-and-match battery cabinets are installed adjacent to the UPS. The IBC-SW can be installed on either theleft or right side or on both sides of the UPS cabinet (see Figure 2).Figure 2. Eaton 93PM UPS and Two 93PM IBC–SWs — Various ConfigurationsLeft Side IBC-SW Installation Right Side IBC-SW Installation Combination IBC-SW InstallationIBC-SW2 IBC-SW1 UPS UPS IBC-SW1 IBC-SW2 IBC-SW1 UPS IBC-SW211..22 OOppttiioonnaall TThheerrmmaall SSeennssoorrThermal runaway protection for VRLA batteries can be provided by installing an optional thermal sensor insidethe battery cabinet.The sensor is wired to an UPS building alarm programmed to turn the charger off when a trip signal is received.The thermal sensor will maintain the trip state until the temperature it is reset by service. Service should becalled to inspect the batteries and reset the sensor in case of such an event.Introduction