36 Eaton 93PM Integrated Battery Cabinet-Small Welded (IBC-SW) Installation Manual 164000639—Rev 03Figure 16. Top and Bottom Entry Conduit and Wire Entry LocationsAccess plate forService use only.**Not to be used forconduit routing**Top Entry ConduitLanding for DC Output /Interface wiring(Remove panel to drillor punch conduit holes.)Bottom Entry ConduitLanding for DC Output /Interface wiring(Remove panel to drillor punch conduit holes.)Top View Bottom ViewFront Front44..44 IInnssttaalllliinngg IIBBCC––SSWW IInntteerrffaaccee WWiirriinnggIBC–SWs can be installed in a line-up-and-match configuration with the interface wiring routed through theIBC–SWs and UPS cabinet or in a standalone configuration with the interface wiring routed between the IBC–SWs and the UPS cabinet using conduit.44..44..11 IInnssttaalllliinngg BBaatttteerryy DDeetteecctt IInntteerrffaaccee CCoonnnneeccttiioonnssNOTE 1 Disconnect terminal block plug from terminal block to wire plug.NOTE 2 If the inter-cabinet wiring access pass-through is not used to install the battery detectinterface wiring connections, conduit must be installed between the battery cabinet andthe UPS cabinet.To install wiring:1. If wiring the IBC–SW battery detect interface terminals using line-up-and-match wiring using the inter-cabinet wiring access pass-through (see Figure 9) continue to Step 2; if wiring the IBC–SW battery detectinterface terminals using the top entry access, proceed to Step 5; if wiring the IBC–SW battery detectinterface terminals using the bottom entry access, proceed to Step 8.NOTE In multiple IBC–SW installations, route the battery interface wiring between IBC–SWsthrough the top of the adjacent IBC–SW using the top side inter-cabinet access pass-through (see Figure 9).Installation