Eaton 93PM Integrated Battery Cabinet-Small Welded (IBC-SW) Installation Manual 164000639—Rev 03 vLLiisstt ooff FFiigguurreessFigure 1. Eaton 93PM Integrated Battery Cabinet–Small Welded .......................................................................... 1Figure 2. Eaton 93PM UPS and Two 93PM IBC–SWs — Various Configurations....................................................... 2Figure 3. Eaton 93PM Integrated Battery Cabinet–Small Welded Dimensions (Front, Right Side, and RearViews) ....................................................................................................................................... 13Figure 4. Eaton 93PM IBC–SW Dimensions (Top and Bottom Views)................................................................... 14Figure 5. Eaton 93PM IBC–SW Center of Gravity............................................................................................. 15Figure 6. Eaton 93PM IBC–SW as Shipped on Pallet ........................................................................................ 20Figure 7. Eaton 93PM IBC–SW Battery Breaker Locations – Front View with Cover Removed................................... 21Figure 8. Removing the Pallet Skids and Supports – Eaton 93PM Integrated Battery Cabinet .................................... 25Figure 9. Line-Up-and-Match Wiring Access Locations...................................................................................... 27Figure 10. Rear Ventilation ........................................................................................................................... 28Figure 11. Top Ventilation............................................................................................................................. 29Figure 12. Wiring Channel Location ................................................................................................................ 31Figure 13. DC Power Terminal Locations – Eaton 93PM IBC–SW.......................................................................... 32Figure 14. Wire Tie Anchors ......................................................................................................................... 33Figure 15. DC Power Terminal Detail – Eaton 93PM IBC–SW............................................................................... 33Figure 16. Top and Bottom Entry Conduit and Wire Entry Locations ...................................................................... 36Figure 17. Interface Terminal Locations – Eaton 93PM IBC–SW ........................................................................... 38Figure 18. Shunt Trip, Battery Detect, and Thermal Sensor Wiring ........................................................................ 40Figure 19. Interface Terminal Detail – Eaton 93PM IBC–SW ................................................................................ 41Figure 20. 93PM Integrated Battery Cabinet Line-Up-and-Match Power Oneline ...................................................... 47Figure 21. 93PM Integrated Battery Cabinet Standalone Power Online – One or Two Cabinets ................................... 48Figure 22. 93PM Integrated Battery Cabinet Standalone Power Online – Three or Four Cabinets ................................. 48Figure 23. 93PM Integrated Battery Cabinet Interface Oneline ............................................................................. 49Figure 24. 93PM Integrated Battery Cabinet Schematic...................................................................................... 50Figure 25. 93PM Integrated Battery Cabinet — Battery String Detail Schematic....................................................... 51