INSTALLATIONEaton 9140 UPS (7.5–10 kVA) User's Guide 164201622 Rev 3 www.eaton.com/powerquality 23EBM SetupThe Eaton 9140 EBM comes with all hardware required for installation ina standard EIA or JIS seismic rack-mount configuration with square orround mounting holes. The rail assemblies adjust to mount in 19-inchpanel racks from 24 to 33 inches deep (28.5 to 32 inches deep ifinstalling the optional seismic mounting brackets).Checking the EBM Accessory KitIf you purchased an optional EBM, verify that the following items areincluded with the EBM: Mounting brackets and fasteners (if not already installed):- (2) front mounting brackets- (2) rear mounting brackets- (12) M4 flat-head screws, plus (2) extra Rails and fasteners:- (2) sliding rail assemblies (left and right)- (4) adapter plates (for 7.1 mm round hole)- (4) adapter plates (for 9.5 mm square hole)- (16) M5 machine screws, plus (2) extra- (2) M6 machine screws, plus (2) extra- (2) M6 clip nuts for racks with round holes, plus (2) extra- (2) M6 cage nuts for racks with square holes, plus (2) extra- (8) M4 machine screws with (8) M4 locknuts, plus (2) extra of each EBM user's guide Optional seismic mounting brackets and fasteners:- (2) EBM seismic mounting brackets- (4) wing bolts, plus (1) extra- (4) M6 machine screws, plus (2) extraNOTE Discard the EBM user's guide if you are installing the EBM with a new UPS at thesame time. Use the UPS user's guide instead to install both the UPS and the EBM.