83InStALLAtIon And opErAtIon mAnuAL 25-13741-C October 2018 www.eaton.comAPPENDIXAPPENDIX 5 – ChecklistBefore Installation:A. Specified cables are used for installation.A. Wiring connections are labeled and verified for correctness.A. Earth connections continuity is verified.After Installation:A. Installation has been carried out as per instructions in the manual.A. Wire connections are as per instructions and diagram mentionedin manual.A. Products are mounted in appropriate location and at appropriate height.A. All units have been checked for operation and communication intelligibility.Configuration:A. Only required access profiles / user logins have been activated.A. PINS of activated profiles have been changed from default values.A. All the units are provided useful names.A. Any deviation from default configuration is duly documented.Caution: Interchanging data and power lines on Outstation willdamage the Outstation.