Program 41 : ACD Setup41-06 : Trunk Work SchedulesLevel:SA(This Program is available for V1.5 or higher)DescriptionUse Program 41-06 : Trunk Work Schedules to set up the Work Schedules for trunks. For eachWork Schedule (1 ~ 4), designate the start and stop times for each of the eight Work Periods. Afteryou set up the schedules, assign them to days of the week in Program 41-07. (This is the sameprogram used by the ACD Agent Work Schedules.)Input DataACD Work Schedule Time Pattern Number 1 ~ 4Item No. Item Input Data Default01 Work PeriodMode Number1 ~ 8 (Start) 0000(End) 0000Start Time 0000 ~ 2359End Time 0000 ~ 2359ConditionsNoneFeature Cross Reference• Automatic Call Distribution (ACD)SL1100 ISSUE 6.02-368 Program 41 : ACD SetupProgram41