23 • vacon commissioningTel. +358 (0)201 2121 • Fax +358 (0)201 21220544. COMMISSIONINGBefore commissioning, note the warnings and instructions listed inChapter 1!4.1 Commissioning steps of Vacon 101 Read carefully the safety instructions in Chapter 1 and follow them.2After the installation, make sure that:• both the frequency converter and the motor are grounded• the mains and motor cables comply with the requirements givenin Chapter 3.2.3• the control cables are located as far as possible from the powercables (see Chapter , step 2) and the shields of the shieldedcables are connected to protective earth3 Check the quality and quantity of cooling air (Chapter 3.1.2)4 Check that all Start/Stop switches connected to the I/O terminals are inStop-position.5 Connect the frequency converter to mainsNote: The following steps are valid if you have API Full or API Limited Applica-tion Interface in your Vacon 10.6 Set the parameters of group 1 according to the requirements of yourapplication. At least the following parameters should be set:• motor nominal voltage (par. 1.1)• motor nominal frequency (par. 1.2)• motor nominal speed (par. 1.3)• motor nominal current (par. 1.4)You will find the values needed for the parameters on the motor ratingplate